GeoExchange And Commercial/Industrial Buildings
In large commercial buildings, such as schools and high-rise offices, the use of multiple GeoExchange systems allows commercial users to control the climate of each indoor area or zone of a building individually. Each classroom of a school, guest room of a hotel or room of an office building may have its own GeoExchange unit.
This design means extraordinary savings because the heat removed from the sunny side is transferred to the GeoExchange unit heating the shady side, reducing the demand on the earth loop.
The Advantages:
Lower operating costs
High efficiency
Less mechanical equipment space
Reduced floor to floor height requirements
Lowest life cycle cost
Minimal maintenance
Long-lasting and reliable
Thermal Conductivity Test
GeoExchange And School Buildings
School systems face many concerns and challenges. Administrators face the problems of upgrading old schools and constructing new facilities that meet today's standards. The way that school buildings are being used has changed - from single-use facilities closed after classes are finished to year-round use with lots of evening and weekend activities.
The life-cycle cost of the heating and cooling system is an important economic consideration. Schools must plan for long-term efficiency to maximize their resources. GeoExchange systems have been shown to have competitive initial investment costs, lower operating and maintenance costs, as well as the lowest life cycle costs compared to other systems. These savings make GeoExchange ideal for schools of all sizes and locations.
The Advantages:
Substantially lower operating costs
Remarkable savings on maintenance
Classroom comfort and user satisfaction
Design flexibility and reduction in roof repairs
Increased safety with no combustion
Educational values and earth stewardship
Competitive installation costs
No boiler room; decreased building size
Eliminates large duct work
Ceiling height can be reduced
Construction cost savings were more than one million dollars for a 180,000 square foot school in Toronto
It's important to include construction savings in any economic analysis.
We also have the ability to conduct formation thermal conductivity test and data analysis. These tests can be useful for sizing the loop field for larger scale projects. These tests consist of connecting a control/data box to a generator and to one vertical loop. The control box then pumps heat into the loop and the data logger records how well the geologic formations in that area accept and dissipate heat. These tests will show the formation's thermal conductivity, thermal diffusivity, and undisturbed temperature.
Commercial Works Completed
Aldo Leopold Foundation Center
Baraboo, WI
12 vertical bores
Barron County Co-op
Barron, WI
33 tons horizontal
Bookworm Gardens
Sheboygan, WI
6 vertical bores
Carthage College Chapel
Kenosha, WI
6 vertical bores
Cedar Ridge Wind Farm
Eden, WI
18 vertical bores
Central Wisconsin Electric Coop – HQ Facility
Rosholt, WI
80 tons horizontal
Children’s Learning Center/Montessori School
Brockman, WI
24 Ton horizontal
Clear Lake Visitor Center
Oneida, WI
5 vertical bores
College of Menominee Nation – Miller Hall
Keshena, WI
10 vertical bores
Community Based Residential Facility
Manitowoc, WI
36 vertical bores with 1 vault
Deer Park
(featured in Geo Outlook Publication)
Oregon, WI
64 tons horizontal
Dickinson Elementary School
DePere, WI
95 vertical bores with 1 vault
Entropy Farms
Woodstock, IL
30 tons horizontal
EPIC Corp
Verona, WI
1,000 vertical bores with 4 vaults
Faith Lutheran Church
30 tons horizontal
Fitchburg Public Library
Fitchburg, WI
50 vertical bores
Gov. Thompson State Park – PEVS bldg
Town of Stephenson, WI
7 vertical bores
Green Lake Bank
Fond du Lac, WI
8 vertical bores
Green Lake Justice Center
Green Lake, WI
224 vertical bores with 1 vault
Heritage Apartment Complex
Brillion, WI
26 ton directional bores
Holy Wisdom Monastery
Middleton, WI
39 vertical bores
House of the Dove
Marshfield, WI
34 tons horizontal
International Crane Foundation
Baraboo, WI
8 tons horizontal
Johnson Controls
Glendale, WI
271 vertical bores with 3 vaults (consulting only)
Kandiyohi Electric Co-op
Kandiyohi, MN
55 tons horizontal
Koala Bear Ventures
Wisconsin Rapids, WI
28 vertical bores
Lac du Flambeau Natural Resource Building
Lac du Flambeau, WI
24 ton directional bores
Lake Mills School
Lake Mills, WI
84 vertical bores with 1 vault
Lake View RecPlex
Pleasant Prairie, WI
210 ton pond loop
Linden Park Elementary School
Middleton, WI
220 tons horizontal
Lomira Municipal Building
Lomira, WI
26 vertical bores
Lussier Community Education Center
Madison, WI
20 vertical bores
Madison Fire Station #12
Madison, WI
50 tons horizontal
Madison Investment Advisors
Madison, WI
14 vertical bores
Marshfield Dental Clinic
Hayward, WI
12 vertical bores
Marshfield Dental Clinic
Medford, WI
26 tons horizontal
Marshfield Dental Clinic
Neillsville, WI
26 tons horizontal
Marshfield Fire and Rescue
Marshfield, WI
22 vertical bores
Menominee Tribe Trans. Center
Keshena, WI
24 vertical bores
M&I Bank
New Berlin, WI
8 vertical bores
Milwaukee Education Recycling Center
Milwaukee, WI
20 vertical bores
Miron Construction
Neenah, WI
76 vertical bores
Mosinee Elementary School
Mosinee, WI
54 vertical bores
Navarino Nature Center
Navarino, WI
20 tons horizontal
Olga Village
Milwaukee, WI
30 vertical bores
PCM Employees Credit Union
DePere, WI
18 vertical bores
Pilgrim Center Church
Green Lake, WI
16 tons horizontal
Prevention Genetics
Marshfield, WI
20 tons horizontal
Promega Hangars and Office
Madison, WI
7 vertical bores
Residential Care Apartment Complex
Manitowoc, WI
14 vertical bores
S.C. Johnson Distribution Warehouse
Racine, WI
12 vertical bores
Shawano Elementary School
Shawano, WI
150 vertical bores with 1 vault
Skilled Nursing Facility
Manitowoc, WI
51 vertical bores with 1 vault
Slinger Wastewater Treatment Plant
Slinger, WI
9 vertical bores
Starion Financial
Middleton, WI
18 vertical bores
Taylor Credit Union
Taylor, WI
16 tons horizontal
Tender Care Vet Clinic
Theresa, WI
50 tons horizontal
Thorp Hardware
Thorp, WI
36 tons horizontal
Tri-county Electrical Co-op
Winona, MN
44 tons horizontal
T-Wall Properties Apartment Complex
Middleton, WI
32 vertical bores
UCC Senior Center
Milwaukee, WI
14 vertical bores
U.S. Fish and Wildlife
Horicon, WI
20 tons pond loop
Verona Elementary School
Verona, WI
64 vertical bores
Village Square
Manitowoc, WI
70 vertical bores with 1 vault
Wisconsin Academy
Columbus, WI
2 each 40 tons horizontal
Wisconsin Air National Guard
Milwaukee, WI
9 vertical bores
Wisconsin D.O.T.
I-90 weigh station
8 vertical bores
Wisconsin Public Power Incorporated
Sun Prairie, WI
40 vertical bores
Commercial Projects currently in progress:
EPIC Corp – Solar Array Field
Verona, WI
Tie-in and flush/pressure test of 2,000 bores with 9 vaults
FIX Office Building
Milwaukee, WI
25 vertical bores
Madison Area Technical College
Madison, WI
216 vertical bore with 2 vaults
Menominee Dialysis Facility
Menominee, WI
33 tons horizontal
Prolamina
Neenah, WI
20 Kelix vertical bores
Town of Nashville Community Building
Pickerel, WI
10 tons horizontal
Urban Ecology Center
Milwaukee, WI
7 vertical bores
G.O. Loop
W11366 Blanecae Rd
Randolph, Wisconsin 53956
Phone: 920-326-2050